Major Journals in which Published Papers

OMEGA, Journal of OR Society , Production Planning and Control, International Journal of Production Economics, International Journal of Quality & Reliability Management, IJPD & MM, IJS&S, IJAMS, AFS Transactions, Journal of Engineering Production, Material Flow, Industrial Engineering Journal, Energy Management, IJ Logistics Information Management and IJM&TM    

Selected List

 

 

 

PUBLICATIONS IN JOURNALS (refereed)

    1. "An inventory Model for a Two Level Repair System". J. Engineering Production, Vol. 2, pp 131-138 1978 (with Prem Vrat)
    2. "Inventory Control of Spares in a Transport Corporation - A Case Study". OMEGA, Vol.7, No2, pp 153-159, 1979. (Prem Vrat)
    3. "The Impact of Repair-Echelon Effectiveness and Location on Spare Stock" IJPD & MM Vol 10, No.1, pp 15-24, 1979. (with Prem Vrat)
    4. "Inventory of Coal in Large Thermal Power Stations" Energy Management, Vol. 3, No. 2, 1979,pp 109-118.(with Prem Vrat)
    5. "A Model for Multi-Stage Multi-Facility and Multi-Product Production- Inventory systems" J. Engg. Production Vol 7, pp80-91, 1984 (A. Gunasekaran and N. Ramaswamy)
    6. "Production Planning Studies in a Pharmaceutical Company - A Case study" Material Flow. Vol 2., pp. 263-275, 1986 (with S.G. Deshmukh)
    7. "Behaviour of a Production System for Varying Marketing Decisions". Int.J. Sys. Sci., Vol 19, No2pp.241-250, 1988 (with A. Gunasekaran and N. Ramaswamy).
    8. "A Model for integrated Multi-stage Multi-Product batch Procurement- Production systems". Industrial Engg. Journal, 28(10),pp 21-28, 1989 (with S.G.Deshmukh).
    9. "Development of Aggregate Production Planning System". Industrial Engg. Journal, (part 1) 28(11) pp 3-9; &, Part ii 28(12) , pp 3-13, 1989 - won credited with the Best Paper 5award (1989-90)., (with R.S. Shah)
    10. "Analytical Approaches to Advertising Management - An Overview, Ind. Engg. Journal 13(20p17, 1984, (with Sunita L. Massand)
    11. "Applied Research and Value Based Training - some Directions for Entrepreneurship Development Cells, Udyog Pragati, 12 (3), pp67-71, 1988 (with C. Gudewar).
    12. "A Model for Integrated Procurement Production System", JORS. Vol.41, No.11, pp.1029-1035, 1990 (with S.G. Deshmukh and S.K. Goyal).
    13. "Analysis of Integrated Procurement-Production System using Mathematical and Simulation Modeling Approaches, Production Planning and Control, Vol. 2, No.3, 1991,pp 257-264(with SG Deshmukh and SK Goyal)
    14. "Lot Sizing in a Class of Multi-Stage Production Inventory Systems", Int.J.Sys. Sci.; vol.21, No.11, pp.2287-2807, 1991. (with A. Gunasekaran and N. Ramaswamy)
    15. "Machine Assignment Policies in a Multi-Facility and Multi-Product Production Inventory Systems", int J. Sys. Sci; Vol 21, No. 11,pp. 2306-2315, 1991 (with A. Gunasekaran and N. Ramaswamy). Deshmukh and S.K. goyal).
    16. "Effect of Machine Failures in Multistage Multifacility and Multiproduct Production Inventory System", Int.J. Sys. Sci., Vol. 22, No. 2, pp.273-291, 1991. (with A. Gunasekaran, S.K. Goyal & N. Ramaswamy).
    17. "Optimization of Multistage Production-Integration System with Significant Set up Operation Time", Int.J. Sys.Sci., Vol. 22, No. 2, pp.273-291, 1991. (with A. Gunasekaran, S.K. Goyal & N. Ramaswamy)
    18. "Integrated Procurement- Production Batch System Parametric Studies and Analysis", Industrial Engg. Journal, Vol. 20 , No. 6,pp 1-5, 1991. (with S.G. Deshmukh)
    19. "Effects of Cycle Time on Integrated Procurement- Production Systems-sensitivity Analysis", Int. J. Production Economics (IJPE), Vol 27, pp. 119-126, 1992 (with S.G.Deshmukh)
    20. "Diagnostic Studies in Copper Coating Process: A Case Study",Int, J. Quality & Reliability Management(IJQ&RM), Vol 10, No.4,pp 32, 1993. (with P.B.S. Reddy and M.N. Gopalan).
    21. "Process Capability Assessment with the Tool Wear: An Investigative Study", Int J. of Quality & Reliability Management, vol.11(2),pp.51-62, 1994(with R. Jagadeesh)
    22. "A Simulation Study of Performance of MRP Based Systems Under Interaction Effects", 6Production Planning and Control, Vol 5(1), 1994 9with G. Agarwal)
    23. "Towards TQM Using KAIZEN Process Dynamics - A Case Study", IJQRM, Vol.12, No. 9 ,pp.192-209,1995 (with S. Gondhalekar and N.B. Godrej).
    24. "Non metalic Inclusions in Ferrous Foundries - A Case Study in Quality Engineering", AFS Trans, Vol 104, 1996 (with D.N. Shivappa)
    25. "Evolving a Reengineering Model for Ferrous foundries in India - Real Life Experience" IJPE, Vol. 50, 1997,pp 225-243 (with D.N. Shivappa)
    26. "Quality of Service in Supply Chain : A Case Study, IJQ&RM Vol. 15, No. 8, 1998,pp 844-859 (with RK Sinha)
    27. Multi-level Scheduling Decisions in a class of FMS using Simulation based Metamodels; JORS , Vol. 49, 1998,pp 591-602 (with R. Sridharan)
    28. Taguchi's Methodology for Multi response Optimization: a case study in the Indian plastics industry, IJQ&RM, Vol. 15 No. 6&7, 1998,pp 646-668, (with PBS Reddy and K. Nishina)
    29. "Strategies for enhancing agility of make-to-order manufacturing systems", International Journal of Agile Management (IJAMS), Vol. 1, No. 1, 1999, pp 23-29
    30. Process Capability Assessment Of Correlated Data Using Time Series Analysis, IJOMAS, Vol. 15, No. 2, 1999, pp147-174 (with R Jagadeesh).
    31. Development of VCMS for SME's, Logistics Information Management, Vol. 13, No. 4, 2000, pp 228-242 (With KN Nandurkar and, A.Thomas).
    32. Development and applications of GT based manufacturing systems - A State of the art review (accepted for publication in IJMTM) (with K.N.Nandurkar)

To be updated after 2000

 

 

Back to home

Being updated after 2000

PUBLICATIONS IN PROCEEDINGS OF CONFERENCES (refereed)

  1. Optimal Policies for Spares in Multi-Echelon Repair Inventory System" Proc. First int. Symp. On Inventories Budapest, 1980. (Ed Attila Chikan,), Esevier Publications, The Netherlands (with Prem Vrat)
  2. "Multi-Stage Production - Inventory Systems: Certain Investigations on Research and Applications". Proc. Third Int. Symp on Inventories, Budapest, 1984. (Ed. Attila Chikan) Elsevier Publications, The Netherlands (with Prem Vrat)
  3. "Computerized System for Management of a Tool Room: A Case Study" Proc. The Int. 7Conf. On Advances in Manufacturing, Singapore, 1984,pp 79-88 (Ed.AFS, UK) (with SR Sardesai and S. Somasundaram)
  4. "Some Studies on integrated Multi-stage Production Inventory Systems". Fourth Int. Symp. On Inventories, Budapest, 1986. (Ed. Attila Chikan);Esevier Publications, The Netherlands (with Prem Vrat)
  5. "The Effect of Cycle Time on Integrated Production Inventory System". Proc. 9th ICPR on Recent Developments in Production Research, 1988pp 187-193, (Ed Anil Mittal ), Elsevier Publications, The Netherlands. (With S.G. Deshmukh and S. Somasundaram).
  6. "Simulation Analysis for Evaluating Effectiveness of Cells in a GT Based Manufacturing System". Proc of the 13th AIMTDR Conference, Jadavpur University, 1988,pp 110-115. (with A. Hanumante and S. Somasundaram)
  7. "A Simulation Study of Effect of Scheduling Policies and Dynamic Lot Sizes in an MRP System", Proc. of the14th AIMTDR Conference, Bombay, 1990, Tata McGraw Hill, NewDelhi, (with G. Agarwal and N. Ramakrishnan).
  8. "A Simulation Study of Effect of Scheduling Policies and Dynamic Lot Sizes in an MRP System", Proc. Of the 14th AIMTDR Conference, Bombay, 1990, Tata Mc Graw Hill, New Delhi, (with G. Agarwal and N. Ramakrishnan).
  9. An Application of Computer Simulation to Industrial Ergonomics- A Case Study (Systems Conference 1991, Madurai (with N. Vinod Kumar).
  10. "BOM Induced Effects in MRP System - A Simulation Study", Proc. Int Symp of Robotics, Mechatronics & Manufacturing Systems, Kobe, Japan 1991 (with G. Agarwal).
  11. A New System for Process Evaluation and Control Using Multiple Measures: An
    Approach to TQM, 15th AIMTDR Conference, Coimbatore 1992, (with R. Jagadeesh).
  12. "Expert System for FMS Scheduling", Proc. 15th AIMTDR Conference, Coimbatore, Tata McGraw Hill Publications, New Delhi, pp.312-317, 1992. (with N.S.S. Rao and S. Somasundaram).
  13. " A New System for Process Evaluation and Control Using Multiple Measures: An Approach to TQM", Presented in the 15th AIMTDR Conference, 1992, Coimbatore,(with R Jagadeesh).
  14. "Modeling and Analysis of an Integrated MRP Based System Using simulation", 7th Int. Symposium of Inventories, Budapest, 1992. (with G. Agarwal).
  15. "A New Approach for Process Diagnosis and Management in Manufacturing System", Proc. Int Symposium of Robotics, Machatronics and Manufacturing Systems, Kobe, Japan, 1992. (with R. Jagadeesh).
  16. Effects of variations in MPS on the Performance of MRP Based Systems", Proc.2nd 8International Conf. On Automation Technology, Automation 92, Taiwan(with G. Agarwal).
  17. "Effects of Scheduling Decisions in a Class of FMS: Simulation Modeling and Analysis", Proc. Japan -USA Symposium of Flexible Automation, Kobe, Japan, 1994. (with R.Sridharan).
  18. "MPS Induced Dynamics in MRP based Systems - A Study to Assess Multifactor Interactions", Proc. Japan-USA Symposium of Flexible Automation, Kobe, Japan, 1994. (with G. Agarwal).
  19. Modeling and analysis of Non metalic Inclusion' problems in Ferrous Foundries using Fault Tree approach - A Case Study' Proc 2nd ICQ & R, Hong Kong. 1997,pp 1-3(with D.N. Shivappa).
  20. Computer based Quality management system for Ferrous Foundries- Development and application, Proc. Fifth Asian Foundry Congress, China 1997. (with D.N. shivappa and KB Bharati).
  21. An integrated approach to Tolerance analysis through Process Capability studies, Proc. ICQEM -97, Coimbatore, 1997, pp 487-493(with R. Jagadeesh).
  22. Computer Integrated System for Quality Management in Foundries- A case study in development and implementation-Proc 45th Indian Foundry Congress, pp 429-440, Bombay, 1997 (with D.N. Shivappa).
  23. Multi level Scheduling decisions in a class of FMS using Simulation modeling and analysis -pp 689-696, Proc 17th AIMTDR conference, 1997 (with R. Sridharan).
  24. Design and development of adaptable cellular manufacturing system, proc 18th AIMTDR conference, IIT KGP, 1998, pp 538-544(with KN Nandurkar).
  25. "Systems and Procedures for Quality Management in Electrical Motor Industry - A Case Study", Trend in Mechanical Engineering Education and Research - Proc.11th ISME Conference, IIT Delhi, February 3-5,1998, pp, 280-285(with R. R Mohanty).
  26. Positioning ISO 14000 standards an investigative study covering selected Indian Industries, Proc.ISME Conference, December 1998 IIT Delhi, pp 286-291.(with Madhu, K. and Sahani, N.).
  27. Bi-Pronged approach for cluster analysis (BIACA) A cell formation algorithm
    Proc.15th ICPR, University of Limerick, Ireland Aug 1999, pp (with KN Nandurkar and A Thomas).
  28. GT in Indian Industries: An Investigative Study in Indian Industries. Proc.15th ICPR,9 University of Limerick, Ireland Aug 1999, pp (with PG Saleesya et al)
  29. An integrated system for managing quality in FHP Motor industries, Proc . POMS 99, December 99,IIT Delhi, pp 159-165, (with RR Mohanty).
  30. Development and application of a new algorithm called ALTROC for CMS, Proc. POMS 99,December 99, IIT Delhi, pp 537-544, (with KN Nandurkar and S Rajagopal).
  31. Tyre Retreading and Inventory Management System (TRIMS) for STU`s, Proc. POMS 99, December 99, IIT Delhi, pp 670-676, (with AK Rao and B Bowonder).
  32. Tyre Inventory System for STU`s, : A diagnostic study, Proc., POMS 99, December 99, IIT Delhi, pp 677-684, (with AK Rao and TL Shanker).
  33. Flexible approach for designing and operating CMS, Proc. FAIM 2000, USA (with K. N Nandurkar).
  34. Multi level scheduling decisions in a failure prone FMS, Proc. FAIM 2000, USA ( with R Sridharan and Vishnu AS).

To be updated after 2000

Back to home

 

PUBLICATIONS (papers accepted based on abstract only)

  1. Optimal Policy in a Two-level Inventory System of Spares in a Transport Corporation, ORSI Convention, New Delhi 1977 (Also Abstracted in OPSEARCH 15(1) 1978, (with Prem Vrat).
  2. Effect of Throughput time on Optimal Inventory Policy in a Two-level system of Spares, IIIE Annual Convention, Tiruchirapalli 1978 (with Prem Vrat).
  3. Optimal Inventory of Recoverable Spares in a Two-level System - A Computer Simulation Approach, ORSI Convention, Banglore 1978, (Also Abstracted in OPSEARCH 15 (4) 1978), with Prem Vrat).
  4. A Study on Coal Inventory in a Thermal Power Station - A Simulation Approach, national Symposium on Industrial Systems, Process Control and Applications, Kurukshetra, 1979, (with Prem Vrat).
  5. A Simulation Model for Multi Echelon Repair Inventory system with Cannibalisation and Transhipment, Proc.Third ISME conference, New Delhi, 1980(with Prem Vrat).
  6. Improving Warehouse Space Utilization - A Case Pertaining to the Central Warehouse of a Large Manufacturing Company, Int. Productivity Congress, Bombay 1983 (with S.M.Kuwalekar).
  7. Multi project Scheduling with Multi-criteria decision heuristics, Proc.Int.Symposium on Project Management,New Delhi,1983,pp158-164) (with A.D Deshpande).
  8. Multi project, Multi resource Scheduling,Proc.Int.Symposium on Project Management, New Delhi,1983, pp 151-157, (with Sarayu Shedde).
  9. Some Replacement Studies in Transport Section of a Large Manufacturing Company, NCQR 1984 Bombay (with G.B. Radhakrishnan).
  10. An OR Based Study of Multi- Stage Production Inventory System; Symposium on Systems Improvement Through OR/ Systems Engg., 1985 New Delhi (with A. Gunasekaran).
  11. Multi Stage, Multi Product Production Inventory systems - Some Studies in Application, IIIE Convention 1986, Bombay (with A. Gunasekaran and N. Ramaswamy).
  12. Aggregate Production planning - Modelling and Optimization in a Case Study, IIIE Convention 1986, Bombay (with R. S. Shah).
  13. Effective Maintenance Management System - A Case Study, IIIE Convention 1986, Bombay (with P.D. Pimphalkhute and S. Somasundaram).
  14. Expert System for Scheduling using Simulation and Graphics, 31st IIE Convention 1989, Bombay (with R. Notani and S. Upadhye).
  15. JIT Manufacturing systems - An Approach for Modelling and Analysis, 31st IIIE Convention 1989, Bombay (with A. Mahesh and G. Jain).
  16. Productivity Improvement in Tool Setting for High Speed Blanking Press, 31st IIIE Convention, 1989 Bombay (with V.Desai ,M.Joshi and N.R. Swamy .
  17. Scheduling system for Manufacturing Machine Tools - A PC Based Approach, 31 st IIIE Convention, 1989 Bombay (with R. Krishnan and N.R. Swamy).
  18. Computerized System for Tool Room Planning - A Case Study, 31 st IIIE Convention, 1989 Bombay (with D. Parchure and J.N. Agarwal)
  19. Computerized Scheduling system for a Company Manufacturing Medical Equipments, 31st IIIE Conventions, 1989, Bombay (with Baldota and N.R. Swamy)
  20. Expert System for a class of Scheduling Problems,Proc.Int.Conf on AI in Industry and Government, Hyderabad, (Ed. E.Balaguruswamy),1989 (with S.Uphadhye and M.N.Gopalan).
  21. Taguchi's Offline QC Method; Concepts, Developments, Modifications, Applications and Criticism: A State of the Art Survey NCQR 1990, Bombay (with P.B.S. Reddy and M.N. Gopalan).
  22. Computerized System for Quality Cost Evaluaton and Control for an Engineering Company, NCQR, 1990, Bombay (with J.N. Agarwal and K.S.Havaldhar).
  23. A Diagnostic Study for Quality Control in a Screw and Fasteners Manufacturing Company, NCQR, 1990 Bombay (with R. Achari and P.B.S. Reddy).
  24. Developing an Effective Maintenance System for a Company Refrigerator, NCQR 1990, Bombay (with K.S Reddy).
  25. "Ancillary Industries and Entrepreneurial Development", Proc. National Seminar on Role and Responsibility of Technical Institutes on Innovation and Entrepreneurship, Nanded,.1990. (with A.G Panchal).
  26. Development and computerisation of production scheduling system for a machine tool manufacturing company, 14th AIMTDR conference, Bombay, 1990 (with A G Panchal).
  27. "Small Scale Industries and Technical Entrepreneurs In India", Proc. National Seminar on Role and Responsibility of Technical Institute in Innovation and Entrepreneurship, pp. 45,Nanded, 1990. (with C. Gudewar).
  28. Process Control Using Multiple Measures - A Simulation Approach, 24th ORSIConvention, Bangalore 1991 (Also Abstracted in OPSEARCH (with R. Jagadeesh)11.
  29. Computerized Scheduling System for a Heavy Engineering Company - A Case Study, 31st IIIE Convention 1991, Bombay (with M.H. Randeria and Y.K. Zamvar).
  30. Production Planning and Control using Hierarchical Decision Processes - A Case Study, 24th ORSI Convention 1991, Bangalore (Also Abstracted in OPSEARCH) (with R.D. Bhardwaj and R.K. Sinha).
  31. Modelling and Analysis of Integrated MRP Based System, 24th ORSI Convention, 1991, Bangalore (Also Abstracted in OPSEARCH) (with G. Agarwal).
  32. Evaluating Scheduling Strategies in Refineries - an ES Frame Work, 24th ORSI Convention 1991, Banglore (Also Abstracted in OPSEARCH) (with Y.G. Ranade and R. Awasthi).
  33. The Effectiveness of Various Process Capability Measures - An Analysis Through Case Study", Proceedings of the 7th National Convention of Production Engineers, 1991 Hyderabad, ( with R Jagadeesh).
  34. A. "Process Control Using Multiple Measures - A Simulation Approach", Presented in the 24th ORSI Conference, 1991, Bangalore, ( also abstracted in OPSEARCH, march-April, 1992)(with R Jagadeesh).
  35. "An Integrated Package for MRP Based Production System - Development and Applications", Proc. 7th National Convention of Production Engineers, Hyderabad, pp. 4.21-4.26, 1991 (with G. Agarwal).
  36. Application of Taguchi's Method of Quality Engineering to Injection Moulding Process - A case study in Plastic Industy. NIQR Conference, Trivandrum, Decemvber 1992. (with P.B.S. Reddy and M.N. Gopalan).
  37. An Investigative study on Alkyd Manufacturing Process using Designed Experiments. NIQR Conference, Trivandrum, December 1992, (with P.B.S. Reddy, A.V Rao and D.V. Gaikar) (won best paper award).
  38. "Expert System for FMS Scheduling", Proc. 15th AIMTDR Conference, Coimbatore, Tata McGraw Hill Publications,New Delhi, pp. 312-317, 1992. (with N.S.S. Rao and S. Somasundaram).
  39. A Simulation Study of FMS Scheduling, 8th ISME Conference, March 1993, IIT Delhi (with R. Sridharan).
  40. A. "Some New Directions in Process Capability Studies", Proceedings of the 8th ISME Conference on Mechanical Engineering, 1993, New Delhi,(with R Jagadeesh).
  41. Some New Directions in Process Capability Studies, 8th ISME Conference, March 1993, IIT Delhi (with R. Jagadeesh).
  42. A. "Process Capability Measure for Multi characteristic Situations", Proceedings of12 International Conference on Excellence in Manufacturing, 1995, Bangalore (with R Jagadeesh).
  43. "An Integrated Approach to Tolerance Analysis Through Process Capability Studies", International Conference on Quality Engineering & Management 1997 Coimbatore,(with R Jagadeesh).
  44. "Computer Integrated System for Product Quality Management", National Conference on Computer Integrated Design & Manufacturing, 2001, Coimbatore (with R.R.Mohanty)
  45. "Quality and Productivity Management of Continuous Casting Process", Natioal Conference on Computer Integrated design & Manufacturing, 2001(with M.S.Kulkarni)
  46. "Capacity Management using Reliability Centered Maintenance", Natinal Conference on Computer Integrated Design & Manufacturing, 2001 (with V.Mariappan)
  47. "Concurrent and Integrated Manufacturing System for Industrial Products", National Conference on Computer Integrated Design & Manufacturing, 2001 (with D.P.Kulkarni)

     

    To be updated after 2000

     

Back to home